- Client
- CAE Simuflite Inc.
- Cost of construction
- $ 13.5M
- Area
- 52,000 ft² (4,831 m²)
- Year of construction
- 2008
- Contractor
- The Haskell Company


A particular challenge of training centre design is that simulators and their supporting classrooms and brief/de-brief rooms require a high level of sound and vibration isolation. Paradoxically, simulators and their supporting equipment generate a large level of low frequency noise which is difficult to contain. Using acoustically designed plenums, sand filled CMUs, and high mass concentrations throughout the project helps with low frequency sound attenuation.